Friday, April 26, 2013
STL Outsider Art Fair 2013
Craig was showing some art at this event. Like most art shows there were some unusual art and unusual people there.
Rain leads to Sewer backup in our finished basement
A week ago Carol called me at work and said the basement was flooding. I hurried home and found 4" of sewer water covering the whole basement.
Made phone calls to Sewer Company, Insurance Agent, Clean up Company, etc. The sewer water kept getting deeper. 4" then 6" then 8". Then a Carbon Monoxide detector was going off. Called the Fire Department. They shut the gas off and rescued Carol's makeup from the downstairs bathroom. The sewer water kept getting deeper. Then the Fire Department called the Electric Company. When they arrived they shut power off to the house. At this point we had 14" of sewer water. We packed a few clothes and abandoned the ship. We went to a hotel.
The next morning we arrived to find the water had gone down but we had a huge mess. Disgusting!
After several days and 2 full dumpsters things are looking better. Carpet and vinyl is gone, all furniture is gone, bottom couple feet of drywall gone, etc. Things are cleaned up and dry. New furnace and water heater installed. New Dryer, refrigerator and freezer delivered.
Now to get everything re-built.
Made phone calls to Sewer Company, Insurance Agent, Clean up Company, etc. The sewer water kept getting deeper. 4" then 6" then 8". Then a Carbon Monoxide detector was going off. Called the Fire Department. They shut the gas off and rescued Carol's makeup from the downstairs bathroom. The sewer water kept getting deeper. Then the Fire Department called the Electric Company. When they arrived they shut power off to the house. At this point we had 14" of sewer water. We packed a few clothes and abandoned the ship. We went to a hotel.
The next morning we arrived to find the water had gone down but we had a huge mess. Disgusting!
After several days and 2 full dumpsters things are looking better. Carpet and vinyl is gone, all furniture is gone, bottom couple feet of drywall gone, etc. Things are cleaned up and dry. New furnace and water heater installed. New Dryer, refrigerator and freezer delivered.
Now to get everything re-built.
Tuesday, April 9, 2013
Subscribe to:
Posts (Atom)